A Smarter Kitchen Investment Starts With Certainty
The Dormani 3-Day Kitchen™ replaces open-ended construction projects and temporary fixes with a predictable, high-quality upgrade — finished in days, not months.
Modernize Your Kitchen - Your Way
ESSENTIALS
Doors-only upgrade
• New doors + drawer fronts
• Cabinet boxes stay as is (you paint if needed)
• Soft-close hinges included
• Door + drawer front + pull handle installation included
• Optional hardware upgrades
$179-249/opening
SIGNATURE
Premium architectural-film wrapped boxes
• New custom-made doors + drawer fronts
• Premium architectural-grade film on boxes
• Soft-close hinges included
• Optional hardware upgrades
$219-299/opening
LUXURY
High-end finishes
• Brand new doors + drawer fronts
• Select 5PC semi-handmade or NanoTech repairable door materials
• Premium architectural-grade film on boxes
• High-end hardware options
• Upgraded edge profiles/trim
$319-379/opening
WE OFFER
FREE INSTALLATION
WHEN SLOTS ARE AVAILABLE
We offer limited free-installation spots per month.
STATUS: 2/4 remaining.

TRADITIONAL GLOW-UP
Total cost: $7800
- Doors and drawers replaced in Velvet Bianco and Rogue style
- Added soft-close functionality to 7 drawers

MODERN CONDO
Total cost: $6200
- Doors and drawers replaced in slab style
- Velvet Onyx upper and Lovesong lower cabinets
- Added soft-close functionality on 6 drawers

MINIMALIST HOME
Total cost: $7400
Why Homeowners Choose the 3-Day Kitchen™
Most homeowners compare kitchens the wrong way — by upfront price.
The smarter comparison is risk, disruption, durability and regret - so you can choose what makes the most sense for your home.
✅Dormani 3-Day Kitchen™
The smart alternative to remodeling
Investment:
Mid-range, $5-12k clearly defined before work begins (Well below a full remodel, without the risks of shortcuts)
Confidence: ⭐⭐⭐⭐⭐ (materials produced in controlled environment)
Timeline
✔ Finished in as little as
3 days
Disruption
✔ Minimal — no demo and usable kitchen during install
Ability to Change Style
✔ Yes — not limited to existing door profiles
What Actually Changes
✔ Cabinet surfaces, door quality, and overall style
Durability
✔ High - Architectural-grade materials designed to last
Risk of Rework or Touch-Ups
✔ Low — engineered system, not paint
Long-Term Confidence
✔
High — designed to be done once
$5-12K
🎨 Painting Cabinets
A shortcut that can become a compromise
Investment:
Lower upfront for basic paint, higher long-term risk (confidence is highly dependent on finisher ability)
Confidence: ⭐⭐⭐
Timeline
◼ 3–7 days (often longer with prep and drying)
Disruption
◼ Moderate — cabinets usually emptied, masking required
Ability to Change Style
◼ No — limited to existing doors and profiles
What Actually Changes
◼ Color only
Durability
◼ Prone to chipping, peeling, and wear
Risk of Rework or Touch-Ups
◼ High — repainting is common
Long-Term Confidence
◼ Medium — many homeowners notice issues with 2 years
$3-8K (basic)
$5-15k (premium cabinet grade)
🔧 Full Remodeling
Maximum change with maximum disruption
Investment:
Highest cost, most budget & timeline uncertainty but gives full change
Confidence: ⭐⭐⭐⭐ (highly dependent on contractor)
Timeline
◼ 6–10+ weeks (often longer)
Disruption
✖ High — demolition, dust, contractors
Ability to Change Style
✔ Yes — full redesign possible
What Actually Changes
✔ Everything
Durability
✔ High — dependent on materials and budget
Risk of Rework or Change Orders
◼ High — scope and cost creep are extremely common
Long-Term Confidence
◼ High result, high regret during the process
$40-70K+
The Bottom Line
Painting can by risky.
Remodeling is
overkill.
The Dormani 3-Day Kitchen™ delivers a real transformation — without the chaos or regret.

Q U A L I T Y
Built differently - by design, with exceptional build quality using the highest-quality materials over 5X thicker and more durable than other solutions, engineered to be tough yet well-styled & functional.

C O N V E N I E N C E
Engineered for speed - built to last. Experience a new look with less interruptions to your daily routines, since our average installation is only 3 days.
S A V I N G S
Because we keep existing surfaces, you get the look you want for a lot less. It's a smarter system, not a shortcut.
Our Promise to You
We Respect Your Space
We treat your home as if it were our own, meticulously preparing the area to ensure a stunning final result. Our job isn’t finished until your new space is left clean and pristine.
Dependable & Predictable
We've streamlined every step of the decision-making process, from our online design tool and quoting system to providing nightly updates once your project begins.
Quality Craftsmanship
We offer our designers and workers salaries above industry averages to ensure meticulous attention to detail, delivering a high-quality finished product that will stand the test of time.



